Wednesday, October 28, 2009

Electricity in NH - The Power Grid

Wikipedia calls a power grid "an interconnected network for delivering electricity from suppliers to consumers."  That makes it sound simple.  Almost trivial.  In reality, our electrical grid is a high-tech marvel that covers a huge geographic distance and contains tens of millions of connections and interconnections.

The graphic below shows a simplified schematic for a power grid (it comes from Germany, so there are probably differences in practices/technology here in the US).


I'm going to let wikipedia do the heavy lifting describing how a power grid works.  In addition to their power grid article, they also have interesting articles on electricity generationelectricity transmission, and electricity distribution.   Passing these topics off to Wikipedia leaves space here for specifics about the power grid in New England and in New Hampshire.  

New Hampshire's power grid is managed by a non-profit Regional Transmission Organization called ISO New England Inc. (ISO-NE).  ISO-NE manages the power grid for New Hampshire, Maine, Vermont, Massachusetts, Rhode Island, and Connecticut.  According to their website, ISO-NE has three responsibilities:
1) Ensure the day-to-day reliable operation of New England's bulk power generation and transmission system

2) Oversee and ensure the fair administration of the region's wholesale electricity markets

3) Manage comprehensive planning for the region's bulk power system

Also, here's another take on the role of Regional Transmission Operators like ISO-NE

Today’s power industry is far more than a collection of power plants and transmission lines. Maintaining an effective grid requires management of three different but related sets of flows – the flow of energy across the grid; the exchange of information about power flows and the equipment it moves across; and the flow of money between producers, marketers, transmission owners, buyers and others.

Although the reliable operation of the grid itself is nothing to take for granted, I'm especially interested in the operation of the bulk energy markets and in the ISO-NE planning process.  I'll cover bulk energy markets in another post and focus here on ISO-NE's plans for the New England power grid.

I found two documents on ISO-NE's website that detail the issues facing New England's power grid.  The first document is the ISO-NE 2009 Regional Power Plan.  This 171 page report, produced annually, details and tracks the 10-year planning and forecasting results for New England's power grid.  The second document is a collection of presentations made by ISO-NE at the NECPUC Symposium last May.  In this document, there's information about New England's dependence on Natural Gas for electricity generation as well as a good summary of the challenges of integrating renewable energy into the regional power grid.

Key facts about New England's bulk power generation and transmission system 
  • 6.5 million households and businesses serviced (14 million people)
  • Over 350 generators and 8,000 miles of high-voltage transmission lines
  • 13 interconnections to systems in NY and Canada
  • More than 33,000 MW of total supply
  • All-time peak demand of 28,130 MW, set on August 2, 2006
  • More than 400 participants in the marketplace (those who generate, buy, sell, transport, and use wholesale electricity or implement demand resources)
  • $12 billion annual total energy market value (2008)
  • Over $4 billion in transmission investment from 2002-2009.  $5 billion planned for next 10 years
  • Six major 345-kilovolt projects constructed in four states

So what are the most pressing issues that ISO-NE identifies in their latest planning document?  My read is that the most pressing issues fall into four broad categories:
1) Transmission line capacity - Can New England's power grid move electricity from generation resources to loads (consumers) with minimal congestion and is the transmission infrastructure robust enough to handle unexpected failures with minimal system-wide impact?

2) Adequacy of generation resources - Given the locations of the loads in the system and the available or planned transmission capacity, will there be adequate, well-located, and reliable generation resources to meet the needs of electricity consumers.  Also, is the system robust and able to handle down-time due to planned maintenance, equipment failures, fuel supply issues, or other unexpected events?

3) Integration of wind and other variable-output generation  resources - Can the power grid operate reliably with the introduction of large amounts of variable-output generation?  Wind is a particular problem in this respect, because output from wind-farms is tough to forecast and alternate generation resources can take time to bring online. 

4) Implementation of  smart grid technologies  - Strategically reducing demand during times of peak-load or equipment failure can dramatically reduce costs compared to sizing generation and transmission capability to handle worst-case scenarios.
Assuring that the transmission infrastructure can meet New England's needs both today and in the future requires ISO-NE to manage and forecast several variables simultaneously.  The introduction of minimum requirements for renewable power generation has added a new dimension to the infrastructure planning problem.  It's not enough to assure the power grid can transport electricity from the generation plants to the load areas.  Today, ISO-NE has to make sure that the infrastructure will be able to support the correct "mix" of generation resources to meet physical electricity demands as well as these regulatory requirements.

Major Transmission additions in New England (source ISO-NE)


Numeric key to map above

As you can see from the above graphics, there are several transmission projects underway or under evaluation in New England that should reduce power grid congestion, improve reliability, and help deliver energy from planned renewable projects.

This presentation by Merrill Lynch/Bank of America, discusses the economics and financing of transmission projects.  Slide 6 shows some cost estimates for some of the projects listed above.  The cost estimate for the NSTAR project (number 3 above) was $275 million, while the Main Power Reliability Program (number 9) is estimated to cost $1.5 billion.  Now you know where that "transmission charge" line item on your electric bill comes from.

Slide 8 of that same Merrill presentation  lists financing details for some other transmission projects.  It appears that as with other capital projects, financing costs are highly dependent on how the deal's structured and who bears the risks.  For example, the $600 million Neptune project in NY and NJ was apparently financed with all debt at 1.25% over the LIBOR rate (say 4-5% total in 2008).   Meanwhile, the $1.1b TrAIL project in PA, WV, and VA was financed with a blended 50/50 debt/equity mix.  That means half the financing was at LIBOR+1.875% and the other half cost 12.7%.  Apparently, a key to Neptune's low financing cost was a 20-year power purchase agreement that helped minimize the risk to debt holders.

Proposed HVDC transmission line projects for New England (source ISO-NE)


The map above shows some proposed high-voltage direct-current (HVDC) projects that are under evaluation in New England.  HVDC transmission technology represents the state-of-the-art in moving large amounts of electricity over medium and long distances.  It can be used in both over-land and under-sea applications.  Many of the proposals listed above will help assure that renewable energy can be carried from places like Canada, New Hampshire, and Maine to population centers in Boston and points west and south.

The figure below shows the capacity for wind projects that are currently in the ISO-NE connection queue.  Interestingly, the total for proposed new wind capacity for New England is 2.7 gigawatts.  That might sound like a lot, but in the US overall, 1.6 gigawatts of wind capacity was installed in just the last three months. 

Wind projects in ISO-NE queue (source: ISO-NE)


In addition to transmission capacity issues, some electricity sources, particularly wind, have output that's variable and tough to predict.  Quick-start natural gas fired generators, demand management techniques, and pumped storage resources can provide a good complement to wind.  Coal and nuclear generation, while valuable as base-load resources, aren't as good at complementing wind generation, since they take too long to fire-up when wind output is much lower than predicted.

Demand management is another topic that's getting plenty of attention in power grid planning.  When planners encounter constraints in either generation or transmission capacity, under the old model, the only solution was to build more power plants and transmission lines.  But building an infrastructure that's sized to handle the very peak of demand,  or the unlikely failure of multiple generating resources, adds lots of cost and may not be the most economical solution. 

Newer smart grid technologies, along with various existing load management techniques, allow ISO-NE to incorporate demand-management into their planning process.  For example, a large industrial user may agree to turn off large power-hungry machinery when called upon to do so.  In exchange, this industrial user will receive a regular capacity payment similar to payments that power plant owners receive for agreeing to provide at-the-ready standby power.  From a planning perspective, a promise of load reduction can be just as good as a promise to start up a gas turbine generator.  

The simple example above is just the tip of the iceberg for demand-response and demand management.  Equipment is being installed to allow grid operators to automatically control large amounts of load.  Also, ISO-NE has implemented market-based approaches to securing demand-response resources.  As of summer 2009, ISO-NE had over 1.9 gigawatts of committed demand-response resources (page 43, tbl 4-8).  That's more than one and a half times the output from the Seabrook nuclear power plant and it could mean that fewer power plants and transmission lines will need to be built. 


One last smart grid concept is the use of smart meters.  The cost of providing electricity is highly dependent on system-load and thus, on the time of day when the electricity is consumed.  It only makes sense to tie the price of electricity to the cost to produce it.  With smart meters, electricity consumers will be incentivized to shift their consumption to when it makes the most sense for them.  In many cases, consumers will be able to shift demand to night-time, when the system is usually under-utilized.  If everyone does this, and if appliance makers build features into their devices to help, peak loads are likely to go down, or at least grow at a much slower rate.  In addition to saving money, shifting demand is also likely to reduce pollution because the power plants that run to meet peak demand are often the biggest polluters.

For just one example of the potential savings from smart meter installations, consider the state of Pennsylvania.   In 2008, a legislative mandate required utilities to install smart meters for all electricity customers.  The cost for the meter upgrade will add $12-24 to a customer's annual electric bill.  However, the savings from shifting demand to lower-cost periods are estimated at $46 per year.  Utilities all around the country are beginning to install smart electric meters.   

Links:  

Thursday, August 20, 2009

Industry Along the Piscataqua River - Tyco Telecommunications

My regular Internet reading list includes a handful of overseas publications, such as the Financial Times and The Economist.  When I load these sites in my web browser, or watch the occasional web video, there's seldom any noticeable delay, even though the data had to travel halfway across the world.  High speed transglobal communication is so ubiquitous that we barely pay notice to the amazing technology it takes to get the job done.

Tyco Telecommunications undersea cable plant - Newington, NH

It turns out, there's a manufacturing facility along the banks of the Piscataqua River in Newington, NH that played a major role in stitching together our global communications infrastructure. That facility is the Tyco Telecommunications undersea cable plant.


Tyco's Newington facility manufactures the so-called wet-plant components of undersea telecommunications cable systems.  This includes undersea cable and devices called repeaters that help keep the communication signals strong enough to reach their final destination.  


View Larger Map

The Newington plant has over 550,000 sq ft of manufacturing space and employs between 100-200 workers.  The facility also includes a deep water pier that allows direct ship loading of the cable that they make at the plant.

Deep water pier on the Piscataqua allows direct ship loading of undersea cable

Tyco's corporate website boasts that the company has installed over 420,000 kilometers of undersea cable worldwide.  That's enough cable to wrap the globe ten  times.  In addition, the company recently completed testing of a new cable system capable of transmitting data at 40 gigabits per second.  Just to put that into perspective, a 40 gigabit per second communications link could carry over half a million telephone calls,  over 50,000 simultaneous music streams, or over 5,000 HD video streams.

Unfortunately, despite these amazing technological achievements, the story of undersea cable manufacturing in NH is not all good news.  The crash of the tech bubble in the early 2000s, coupled with global telecommunications overcapacity that persists today, has resulted in several tough years for the folks at Tyco's Newington plant.  Tyco's footprint in NH, which at one time included over 1,500 workers at facilities in both Exeter and Newington, has shrunk to just 200 or so workers in Newington alone.

Friday, July 24, 2009

NH police on twitter - One month later...

Last month, several news outlets, including the Union Leader, WMUR,  Seacoast Online and others reported about a few cases of local police departments using twitter as a way to keep folks updated on local happenings.  I read the story with interest because it seemed like a good application for twitter.  Well, it's been about a month since those stories broke, so I thought I'd post a quick follow up.

First I have to confess a bias - IMO, twitter has become way over-hyped.   Lots of people are creating twitter feeds in cases where the technology is clearly not a good match.   Let's face it, using twitter involves tradeoffs.  Not all of us can condense our thoughts down to just 140 characters.  Twitter is really a niche application that does a great job with a certain type of communication - Real-time point-to-multipoint and multipoint-to-multipoint messaging where access to a web browser is limited.  That's it.   If your message doesn't need to be read by its intended targets within an hour or two, and if the senders and the receivers of messages are likely to have ready access to an Internet connected computer, twitter probably isn't the right technology for the job.

That said, local police departments' use of twitter seemed like a good match for the technology.  Both the senders of the messages, as well as the receivers might not have computer access and time is certainly of the essence.

Last month, I signed up to the RSS feed for the EppingNHPolice twitter account.  Receiving tweets through RSS in a news reader is pretty handy.   Part of twitter's power is that it can be accessed by whatever means is most convenient.  Just because you can use your cell phone doesn't mean you have to.  Since my online world is centered around Google Reader, that's how I subscribed to the EppingNHPolice feed.

It takes just a couple of mouse clicks to subscribe, even without a twitter account.  BTW, if you haven't heard of Google Reader, or RSS Readers in general, you might like to try one out.  I now subscribe by RSS to just about everything I read on the Internet.  And not just blogs,  I also use Google Reader to keep track of which online newspaper articles I've read.  (I usually click through in the reader to read the article on the newspaper site so they still get the ad revenue)

After a month of following the EppingNHPolice twitter feed, IMO, they've really hit a home run.  I don't know anything about how they're structured, or who the driving force is behind the tweets, but if you follow the feed for any length of time, you can't help but notice that they're using the technology to the fullest.  Below, I've posted a summary of the tweets from the last day or two.   Over the last month they seem to average 5-10 tweets a day.  That seems to me like a reasonable number considering everything.


The GreenlandPolice have started using twitter as well.  They also seem to be doing a good job with it, although their tweets are pretty sparse compared to Epping.  Greenland does a tweet every day or two compared to Epping's 5-10 tweets a day.  Maybe Epping is just a lot more happening than Greenland :)


Disclaimer - I'm not a resident of either Greenland or Epping, although I do drive through both towns from time to time.